Construction steps of double screw socket joint in PC structure

分類:industry-forum 739

Construction steps of double screw socket joint in PC structure

 

In the field of Building PC, the double screw socket joint can completely replace the grouting joint. Compared with the grouting joint, the connection quality is easier to ensure and judge. The joint connection has no “disturbance” problem, and the component connection is simpler, faster and convenient. After the joint is connected, the construction method of the structural gap is the same as that of the grouting joint, and the grouting material is used to fill the structural gap. For specific construction operation, please refer to the operation specification for connecting PC structure with double screw socket joint.

 

Construction steps of double screw socket joint in PC structure

 

1) The reinforcement is in place and fixed in the mould

 

 

2) Component pouring concrete

 

3) Component pre assembled joint connector ready for use

 

4) Component hoisting in place

 

5) Inspection and adjustment before reinforcement connection

 

6) Double threaded joint connection

 

7) Completion and inspection of double threaded joint connection