{"id":981,"date":"2021-02-24T17:06:14","date_gmt":"2021-02-24T09:06:14","guid":{"rendered":"http:\/\/wh-bej63k50i6tu2o0we.my3w.com\/?p=981"},"modified":"2021-10-18T11:16:31","modified_gmt":"2021-10-18T03:16:31","slug":"pc%e6%9e%84%e5%bb%ba%e8%bf%9e%e6%8e%a5","status":"publish","type":"post","link":"https:\/\/www.bjwlx.com\/en\/?p=981","title":{"rendered":"PC member – double threaded reinforcement connection"},"content":{"rendered":"

Key points of connection control of reinforced concrete precast beams in PC buildings<\/h2>\n

 <\/p>\n

\"\"<\/p>\n

 <\/p>\n

Double screw sleeve reinforcement connection scheme for vertical main reinforcement of reinforced concrete in PC building<\/h2>\n

 <\/p>\n

\"\"<\/p>\n

Connection scheme 1<\/p>\n

 <\/p>\n

\"\"<\/p>\n

Connection scheme 2 (basically consistent with the connection mode of grouting joint)<\/p>\n