{"id":851,"date":"2021-02-23T15:25:02","date_gmt":"2021-02-23T07:25:02","guid":{"rendered":"http:\/\/wh-bej63k50i6tu2o0we.my3w.com\/?p=851"},"modified":"2021-10-18T11:26:05","modified_gmt":"2021-10-18T03:26:05","slug":"wl-%e5%8f%8c%e8%9e%ba%e5%a5%97%e9%92%a2%e7%ad%8b%e6%8e%a5%e5%a4%b4%e5%9c%a8%e9%92%a2%e7%ad%8b%e7%ac%bc%e6%95%b4%e4%bd%93%e5%af%b9%e6%8e%a5%e7%9a%84%e6%96%bd%e5%b7%a5%e6%96%b9","status":"publish","type":"post","link":"https:\/\/www.bjwlx.com\/en\/?p=851","title":{"rendered":"Application of quick connection of large diameter reinforcement cage"},"content":{"rendered":"
<\/p>\n
<\/p>\n
<\/p>\n
<\/p>\n
<\/p>\n
1. 50 specification double screw socket connection joint of Beijing transportation hub<\/p>\n
<\/p>\n
<\/p>\n
2. Hoisting of test pile head of Beijing transportation hub<\/p>\n
<\/p>\n
<\/p>\n
3. Hoisting of 50 specification reinforcement cage in Beijing transportation hub<\/p>\n
<\/p>\n
<\/p>\n
4. The reinforcement cage of Beijing transportation hub is hoisted in place<\/p>\n
<\/p>\n
<\/p>\n
5. Stirrup binding shall be carried out after the connection of 50 specification reinforcement cage of Beijing transportation hub is completed<\/p>\n
<\/p>\n
<\/p>\n
6. Stirrup binding shall be carried out after the connection of 50 specification reinforcement cage of Beijing transportation hub is completed<\/p>\n
<\/p>\n
<\/span><\/p>\n 7. The 50 specification double screw sleeve connection of Beijing transportation hub has been completed<\/p>\n <\/p>\n <\/p>\n 1. The world’s first application case of integral butt joint of double screw sleeves of reinforcement cage<\/p>\n <\/p>\n <\/p>\n 2. Binding and forming of reinforcement cage<\/p>\n <\/p>\n <\/p>\n 3. Pre connection is not required for the installation of reinforcement cage sleeve<\/p>\n <\/p>\n <\/p>\n 4. Lower reinforcement cage shall be hoisted in place<\/p>\n <\/p>\n <\/p>\n 5. The upper reinforcement cage shall be hoisted in place<\/p>\n <\/p>\n <\/p>\n 6. The double screw sleeves of the reinforcement cage are connected as a whole in half an hour. The product is a first-class joint and can be set at the same section to meet the requirements of cutting test pieces on site. There is no leakage of filament buckle<\/p>\n <\/p>\n <\/p>\n 6. Site exhibition of double screw sleeve connection technology in Qinghe station<\/p>\n <\/p>\n <\/p>\n Technical application demonstration at Qinghe station<\/p>\n <\/p>\n <\/p>\n <\/p>\n 1. Overall hoisting and connection of the first pile of xiong’an station<\/p>\n <\/p>\n <\/p>\n 2. Double screw sleeve field connection of xiong’an station<\/p>\n <\/p>\n 3. The first pile of xiong’an station is connected in half an hour<\/p>\n <\/p>\n <\/p>\n 4. Completion of the first pile of xiong’an station<\/p>\n <\/p>\n <\/p>\n 5. Close up picture of double screw sleeve first pile of xiong’an station<\/p>\n <\/p>\n <\/p>\n 6. The first pile of xiong’an station has completed site acceptance and taken photos for evidence collection<\/p>\n <\/p>\n <\/p>\n 7. Reinforcement cage Prefabrication Yard of xiong’an station<\/p>\n <\/p>\n <\/span><\/p>\n 8. Hoisting and transfer of reinforcement cage in xiong’an station<\/p>\n \u00a0<\/span><\/p>\n 9. Photography works of xiong’an station project<\/p>\n <\/p>\n","protected":false},"excerpt":{"rendered":" Application of quick connection of large diameter reinf […]<\/p>\n","protected":false},"author":1,"featured_media":2091,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[8],"tags":[],"_links":{"self":[{"href":"https:\/\/www.bjwlx.com\/en\/index.php?rest_route=\/wp\/v2\/posts\/851"}],"collection":[{"href":"https:\/\/www.bjwlx.com\/en\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bjwlx.com\/en\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bjwlx.com\/en\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bjwlx.com\/en\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=851"}],"version-history":[{"count":2,"href":"https:\/\/www.bjwlx.com\/en\/index.php?rest_route=\/wp\/v2\/posts\/851\/revisions"}],"predecessor-version":[{"id":3518,"href":"https:\/\/www.bjwlx.com\/en\/index.php?rest_route=\/wp\/v2\/posts\/851\/revisions\/3518"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bjwlx.com\/en\/index.php?rest_route=\/wp\/v2\/media\/2091"}],"wp:attachment":[{"href":"https:\/\/www.bjwlx.com\/en\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=851"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bjwlx.com\/en\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=851"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bjwlx.com\/en\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=851"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}} Application of double screw sleeve in Qinghe station<\/span><\/h2>\n
\u00a0Xiong’an station case<\/span><\/h2>\n