{"id":601,"date":"2021-02-10T14:03:52","date_gmt":"2021-02-10T06:03:52","guid":{"rendered":"http:\/\/wh-bej63k50i6tu2o0we.my3w.com\/?p=601"},"modified":"2021-10-18T11:47:36","modified_gmt":"2021-10-18T03:47:36","slug":"wl-%e6%96%b0%e5%9e%8b%e6%8e%a5%e5%a4%b4%e5%9c%a8%e5%89%aa%e5%8a%9b%e5%a2%99%e4%b8%ad%e7%9a%84%e5%ba%94%e7%94%a8","status":"publish","type":"post","link":"https:\/\/www.bjwlx.com\/en\/?p=601","title":{"rendered":"Application of WL new joint in shear wall"},"content":{"rendered":"

 <\/p>\n

Installation and connection of shear wall panel step 1: (post pouring concrete)<\/b><\/h2>\n
    \n
  1. Before the installation of shear wallboard, clean the installation position of wallboard and remove the protective plug outside the lower inner screw sleeve;<\/li>\n
  2. A gap of 250-300mm (according to the design requirements) shall be reserved between the precast shear wall panel and the surface of the lower member, and the panel shall be hoisted in place;<\/li>\n
  3. The double screw socket joints of reinforcement connection at the connecting surface of the slab are in place (see Fig. 1);<\/li>\n
  4. Support the formwork and pour concrete at the post cast strip;<\/li>\n
  5. The formwork shall be removed after the concrete strength reaches the formwork removal strength. So far, the installation and connection of components are completed.<\/li>\n<\/ol>\n

     <\/p>\n

    Installation and connection of shear wall panel step 2: (post grouting)<\/strong><\/h2>\n
      \n
    1. Before the installation of shear wallboard, clean the installation position of wallboard and remove the protective plug outside the lower inner screw sleeve;<\/li>\n
    2. 20 mm (according to the design requirements) clearance shall be reserved between the precast shear wall panel and the surface of the lower component, and the panel shall be hoisted in place;<\/li>\n
    3. The double screw sleeve joints of reinforcement connection at the connecting surface of the plate are in place (see Fig. 1), and the connecting nut is locked;<\/li>\n
    4. Grouting material shall be poured at the post cast strip;<\/li>\n
    5. After the strength of grouting material reaches the strength, the wall panel support can be removed, and the installation and connection of components are completed.<\/li>\n<\/ol>\n

       <\/p>\n

      \"\"<\/p>\n

       <\/p>\n

       <\/p>\n

       <\/p>\n

       <\/p>\n","protected":false},"excerpt":{"rendered":"

        Installation and connection of shear wall panel […]<\/p>\n","protected":false},"author":1,"featured_media":941,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[8],"tags":[],"_links":{"self":[{"href":"https:\/\/www.bjwlx.com\/en\/index.php?rest_route=\/wp\/v2\/posts\/601"}],"collection":[{"href":"https:\/\/www.bjwlx.com\/en\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bjwlx.com\/en\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bjwlx.com\/en\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bjwlx.com\/en\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=601"}],"version-history":[{"count":2,"href":"https:\/\/www.bjwlx.com\/en\/index.php?rest_route=\/wp\/v2\/posts\/601\/revisions"}],"predecessor-version":[{"id":3533,"href":"https:\/\/www.bjwlx.com\/en\/index.php?rest_route=\/wp\/v2\/posts\/601\/revisions\/3533"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bjwlx.com\/en\/index.php?rest_route=\/wp\/v2\/media\/941"}],"wp:attachment":[{"href":"https:\/\/www.bjwlx.com\/en\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=601"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bjwlx.com\/en\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=601"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bjwlx.com\/en\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=601"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}