{"id":2237,"date":"2021-05-12T11:29:54","date_gmt":"2021-05-12T03:29:54","guid":{"rendered":"http:\/\/www.bjwlx.com\/?p=2237"},"modified":"2021-10-12T17:10:38","modified_gmt":"2021-10-12T09:10:38","slug":"%e5%9e%8b%e9%92%a2%e5%8a%b2%e6%80%a7%e6%9f%b1%e4%b8%8e%e9%92%a2%e7%ad%8b%e8%bf%9e%e6%8e%a5","status":"publish","type":"post","link":"https:\/\/www.bjwlx.com\/en\/?p=2237","title":{"rendered":"Connection between section steel rigid column and reinforcement"},"content":{"rendered":"

Project: Tongzhou wanguojiayuan, the third company of China Construction Second Engineering Bureau<\/h2>\n

High efficiency steel rigid column mechanical connection, welding sleeve + double screw sleeve + welding sleeve reduces a large number of welding operations, saves the expensive cost of connecting plate, and the on-site operation is convenient and fast.<\/p>\n

 <\/p>\n

\n