{"id":2193,"date":"2021-04-29T13:22:32","date_gmt":"2021-04-29T05:22:32","guid":{"rendered":"http:\/\/www.bjwlx.com\/?p=2193"},"modified":"2021-10-12T17:41:42","modified_gmt":"2021-10-12T09:41:42","slug":"%e9%9a%a7%e9%81%93%e9%92%a2%e7%ad%8b%e5%b7%a5%e7%a8%8b%e5%b7%a5%e4%b8%9a%e5%8c%96%e8%a7%a3%e5%86%b3%e6%96%b9%e6%a1%88","status":"publish","type":"post","link":"https:\/\/www.bjwlx.com\/en\/?p=2193","title":{"rendered":"Industrialization solution of tunnel reinforcement engineering"},"content":{"rendered":"

Industrialization solution of tunnel reinforcement engineering<\/h1>\n

 <\/p>\n

\"\"<\/p>\n

Construction pain points of tunnel reinforcement works:<\/h2>\n

 <\/p>\n

Low construction efficiency of reinforcement works;
\nLarge number of on-site construction personnel and high labor intensity;
\nThe mechanical connection of the last joint of the “ring reinforcement” in the tunnel is difficult and the quality is difficult to guarantee;
\nThe degree of mechanization of reinforcement engineering operation is low.<\/p>\n

 <\/p>\n

Industrialized construction scheme of tunnel reinforcement works:<\/h2>\n

 <\/p>\n

\"\"<\/p>\n